SAP C_S4CMA_2302 Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Topic 1: Cost Management | 8% - 12% | - Actual production cost calculation - Cost object controlling |
| Topic 2: Manufacturing Execution | 18% - 22% | - Production processing and order management - Kanban supply and repetitive manufacturing - Shop floor operations and backflush |
| Topic 3: SAP Activate Methodology and Implementation | 12% - 16% | - Guided configuration and self-service UIs - Data migration fundamentals - Phases and scope of SAP Activate - Extensibility and integration concepts |
| Topic 4: Quality Management | 10% - 14% | - Quality management best practices - Internal problem handling and configuration |
| Topic 5: SAP S/4HANA Cloud Public Edition Overview | 8% - 12% | - RISE with SAP strategy and solution scope - Cloud security, GDPR and compliance - Identity authentication and access management |
| Topic 6: Production Planning | 16% - 20% | - Basic production planning configuration - Demand-driven replenishment - Material Requirements Planning (MRP) |
Preparing for C_S4CMA_2302 with Feedback That Corrects You
- SAP Activate Methodology and Implementation (12% - 16%)
- Cost Management (8% - 12%)
- Manufacturing Execution (18% - 22%)
SAP Certified Application Associate - SAP S/4HANA Cloud public edition - Manufacturing Sample Questions:
Based on the SAP Activate methodology, which of the following tests are formal, and therefore must be documented during implementation?
- A. Unit test
- B. Business process test
- C. Integration test
- D. String test
Correct Answer: B,C 🗳️
How can you specify a heuristic for product planning in PP/DS for SAP S/4HANA, if the product is not to be planned using the standard heuristic defined in Customizing?
- A. On the Advanced Planning tab page in the SAP S/4HANA Material master
- B. You can start a standalone master server by executing.
- C. Navigate to the Process Defects app from the defect details popover
- D. their requirement type or by the requirements strategy.
Correct Answer: A 🗳️
To which of the following systems does SAP provide pre-delivered integration with SAP S/4HANA? (3 correct)
- A. SAP Human Capital Management
- B. Third-party systemsfor managing travel and expenses
- C. SAP Concur
- D. SAP Ariba
- E. SAP SuccessFactors
Correct Answer: C,D,E 🗳️
Why does SAP deliver country-specific versions of SAP S/4HANA Cloud? (3 correct)
- A. To offer internationalization capabilities, such as Unicode compliance, currency support, time-zone adjustments, text processing using user locals, and more
- B. To facilitate deployment in local data centers
- C. To offer the software in local languages
- D. To empower the business to run complaint lo cally and compete globally
- E. To fulfill the export goals of the company
Correct Answer: A,C,D 🗳️
How can you use the Alert Monitor to monitor production planning in PP/DS?
- A. transformations return pointers to new RDDs.
- B. we must define an alert profile for the application.
- C. allows you to write quick throw away functions without naming them
- D. where the argument to the for each method is an expression for an anonymous function.
Correct Answer: B 🗳️